| All-terrain tabu search approaches for production management problems | Recent Development of Metaheuristics |  | | 2018 | 547 | 0 |
|
| Impact of vehicle tracking on a routing problem with dynamic travel times | RAIRO - Operations Research |  | | 2018 | 1,519 | 0 |
|
| Three-level inventory deployment for a luxury watch company facing various perturbations | Journal of the Operational Research Society |  | | 2017 | 613 | 1 |
|
| Inventory deployment with uncertainty on production and lead-times, proceedings of the international conference on industrial engineering and systems management | Proceedings of the International Conference on Industrial Engineering and Systems Management (IESM) |  | | 2017 | 423 | 0 |
|
| Metaheuristics for truck loading in the car production industry | International transactions in operational research |  | | 2017 | 546 | 0 |
|
| A push shipping-dispatching approach for high-value items: from modeling to managerial insights, proceedings of the international conference optimization and decision science | Optimization and Decision Science: Methodologies and Applications |  | | 2017 | 425 | 0 |
|
| Metaheuristics for a job scheduling problem with smoothing costs relevant for the car industry | Networks |  | | 2016 | 533 | 1 |
|
| From packing to dispatching: supply chain optimization techniques | |  | | 2015 | 1,278 | 833 |
|
| Tabu search with guided restarts for a car production problem with a 2/3 balancing penalty | META'14. 5th International Conference on Metaheuristics and Nature Inspired Computing |  | | 2014 | 582 | 0 |
|
| Online Vehicle Routing and Scheduling with Continuous Vehicle Tracking | ROADEF 2014 - Proceedings of the 15th Annual Congress of the French Operations Research Society |  | | 2014 | 577 | 0 |
|
| Ant Algorithms for a Truck Loading Problem with Multiple Destinations | Proceedings of the 14th International Conference on Project Management and Scheduling |  | | 2014 | 575 | 1 |
|
| A Renault Truck Loading Problem: from Benchmarking to Improvements | Proceedings of the 14th EU/ME Workshop |  | | 2013 | 716 | 584 |
|
| Heuristics for a Multi-Machine Multi-Objective Job Scheduling Problem with Smoothing Costs | Proceedings of the 1st IEEE International Conference on Logistics Operations Management |  | | 2012 | 562 | 0 |
|