| A production and distribution scheduling matheuristic for reducing supply chain variations | Transportation research. Part E, Logistics and transportation review |  | | 2025 | 33 | 0 |
|
| A matheuristic for tactical locomotive and driver scheduling for the Swiss national railway company SBB Cargo AG | OR-Spektrum |  | | 2023 | 97 | 117 |
|
| Multi-neighborhood local searches for industrial problems in production, transportation and distribution | |  | | 2020 | 821 | 120 |
|
| Dynamic Tabu Search for Enhancing the Productivity of a Bottle Production Line | Advances in Optimization and Decision Science for Society, Services and Enterprises |  | | 2019 | 243 | 0 |
|
| Solving the Wire-Harness Design Problem at a European car manufacturer | European Journal of Operational Research |  | | 2019 | 447 | 2 |
|
| Production and distribution planning for smoothing supply-chain variations | Proceedings of the 16th international workshop on project management and scheduling |  | | 2018 | 402 | 0 |
|
| Aircraft landing planning: past, present and future | Proceedings of the 19th annual congress of the french operations research society |  | | 2018 | 557 | 511 |
|
| Optimizing the standardization of car cables | Proceedings of the 18th annual congress of the french operations research society |  | | 2017 | 465 | 159 |
|