| A production and distribution scheduling matheuristic for reducing supply chain variations | Transportation research. Part E, Logistics and transportation review |  | | 2025 | 28 | 0 |
|
| A matheuristic for tactical locomotive and driver scheduling for the Swiss national railway company SBB Cargo AG | OR-Spektrum |  | | 2023 | 93 | 95 |
|
| Multi-neighborhood local searches for industrial problems in production, transportation and distribution | |  | | 2020 | 802 | 116 |
|
| Dynamic Tabu Search for Enhancing the Productivity of a Bottle Production Line | Advances in Optimization and Decision Science for Society, Services and Enterprises |  | | 2019 | 239 | 0 |
|
| Solving the Wire-Harness Design Problem at a European car manufacturer | European Journal of Operational Research |  | | 2019 | 443 | 2 |
|
| Production and distribution planning for smoothing supply-chain variations | Proceedings of the 16th international workshop on project management and scheduling |  | | 2018 | 398 | 0 |
|
| Aircraft landing planning: past, present and future | Proceedings of the 19th annual congress of the french operations research society |  | | 2018 | 552 | 467 |
|
| Optimizing the standardization of car cables | Proceedings of the 18th annual congress of the french operations research society |  | | 2017 | 460 | 144 |
|